City Point, London

Following the successful completion of the £3m toilet fit-out package, we negotiated the landlord’s CAT A fit-out of seven floors totalling 8,400m2 of office space. The works comprised the full services installation with a four-pipe fan coil system, high specification metal ceilings, wall cladding, raised floors, decoration and carpets. Following successful completion of the seven floors, we then completed a further two floors (35 and 36) at the top of the building.

  • Wates City
  • £4,300,000
  • Design and Build