Aztec West, Bristol

Having originally constructed 910 Hempton Court in 2002, Blenheim House Construction was invited to upgrade the internal finishes to current standards prior to the three-storey commercial building being remarketed.

The scope of works included the renewal of ceilings and floor finishes in the office areas and the overhaul of the existing M&E installations, in line with current standards.  The toilet cores were subject to a programme of improvement with the introduction of new ceilings, wall and floor tiling, cubicles and contemporary vanity units.  The existing reception area was refurbished with new floor finishes, feature wall and ceiling treatments, and a thorough lighting design overhaul to deliver a bright, modern and inviting space.

External works included the provision of new signage and upgraded hard and soft landscaping.

  • F&C REIT Asset Management
  • £940,000
  • Design and Build
  • Madlin + Maddison
  • AWW Architecture
  • Madlin + Maddison
  • ITD Consultants