Abbey Studios, London

This was a difficult and interesting project on a tight site with all the normal issues of working alongside an occupied building. The new structure had to be totally isolated from the existing structures which provided us all with some interesting challenges. We handed over the first part of the shell for a specialist fit out after nine weeks on site. The remainder of the new building was then completed and fully fitted out.

  • EMI
  • £420,000
  • Design and Build